Sunday, January 26, 2014

Chapter 76a / 77a Partial - The Windows and Shōji to the Right Porch, The Kadomatsu

December 27th - 26th January 2013

The past month has been very busy and somewhat stressful.  I am still laid off.  I am not very motivated to do much of anything at all.  Yet today, 26th January, I woke up with the realization that technically, I am already 50 years old and I haven’t got all that much time left to complete all the projects I have started.  What will happen to them once I am gone I do not know.  But dammit, I owe it to myself to finish them.  So, onwards!!!

I had decided to jump into some of the future chapters to pull out the pieces to make the windows and the shōji for the porch.  I just didn’t feel like painting up more pieces during the holiday weekend leading up to New Year’s so just wanted to do something less challenging and more satisfying.  I actually enjoy installing the windows and shōji.  That was pretty easy and finally I actually got to use the shōji paper I had purchased at my favorite Florentine shop Ajisai.  The paper is gorgeous.  The watermark will make such a difference once the lights are installed.  I only wish I had this paper when I had done the other porches.  Well, the last two will have the actual correct paper!
Shōji window frames.

The shōji paper. You can see the watermark.
Shōji paper in place.

Fixing the first two of four shōji.
I installed the two (out of four) shōji doors and then moved on to the porch windows.  The upper wall area was a total pain to fit (as usual) and only after finishing one window did I realize I was going to have to drastically sand down this piece.  So, at some point after the New Year, I did just that.  Note that I have lots of manual problems when I am working.  I had cut myself badly whilst preparing the New Year’s dinner (nearly taking off the tip of my left index finger) and ended up having to bandage it for over two weeks.  I had just taken off the bandages and was working on sanding down the piece to the window on the porch and of course, the dremel sander slipped and I took off a big chunk of the same finger’s knuckle.  Bleeding again.  The disadvantage of having MS is that often I cannot gauge the actual time/space continuum and end up thinking a knife or tool is a few centimeters or millimeters from where it actually is.  Hence the chopping off of bits of my fingers.  The advantage is that there is a lot less pain involved (reduced sensation) once the cutting has happened.  Which can also be bad since until I see blood, I have no idea that I’ve cut myself.  Anyway..... working along with my dremel and bleeding off a knuckle, I did manage to sand down the piece sufficiently to fit in the windows which, once sized correctly, slid into place.  Done.

The upper small wall area was the one that needed sanding.

Finished windows and half of the shōji.
Over the holidays, I got a FaceBook notification from an association that I have been following.  It’s the Lailiac Association for Japanese expats here in Italy.  Every year they have a wonderful weekend expo of all things Japanese.  Anyway, they had  posted a few pictures of kadomatsu (or matsukado) which are New Year’s decorations.  They are supposed to be in pairs but I’ll make one this year and one next year.  Hopefully the house will be complete by then.  I cut off a branch from my pine tree and let the needles dry out.  Then I could construct my decoration.
Another example of the Kadomatsu

And example of a Kadomatsu


















 I used a perfume bottle top and wrapped it with a little double sided tape.  I then wrapped some raffia vertically and tied it off.  I put some florists’ green foam inside and then cut a green straw in three heights which is doubling for my bamboo.  I painted the inside with a little buttermilk to simulate the inside of the bamboo.  I then bound some of my pine needles and found some other greenery to use and stuck it into the base.  The last bit was some red berry like decoration.  I had some white berry bits and just painted them red.
The perfume bottle top. Adding some raffia.

Adding a little green foam inside to hold the florals
The wrapped vase.
Painting the inside of a green straw

The pine needle bunches

Painting the white berries red.














Taken from a simple explaination:
“The central portion of the kadomatsu is formed from three large bamboo shoots, ... Similar to several traditions of ikebana (Japanese flower arrangement), the shoots are set at different heights and represent heaven, humanity, and earth with heaven being the highest and earth being the lowest. Some kadomatsu place the humanity and earth shoots at the same height.”

Wishing everyone a very healthy and happy 2014.
My kadomatsu outside in the front entrance. Happy 2014!

Friday, December 27, 2013

Chapter 75 - Back Wall to the Right Front Porch - Second Floor

 December 21st - 27th 2013

I had already opened the blister pack for this chapter to fish out a few pieces to install the bathroom previously so I had to pretty much remember what I had removed (I forgot to mark them). Anyway, I figured out which pieces were left over and installed some wooden slats on the underside of the two rooms.  If I remember, this will help in making the entire second floor fit onto the floor below it with some stability.
Slats to add stability to the entire floor.
Went thru the usual sanding and cleaning of the pieces then started painting the various parts.  Brown for the wooden beams and support, Buttermilk for the outside and white for the inside pieces. 
Next was weaving the small wooden sticks into what will eventually be the ranma or architectural wall above the shōji doors to the front porch.  These need to be glued and left overnite for drying. I then assembled the remaining pieces to create the back wall of the porch.  Some pieces needed lots of coaxing as usual since they don’t fit in well to the prefabricated slots but after some sanding and force fitting, it went fine.


Gluing the woven sticks.

Fitting the ranma
I decided to leave some pieces out since I preferred at this point to jump ahead and install both the sliding windows and the shōji before proceeding with the actual porch area.  Having done these porches before, it just seemed easier.  Onwards...

Leaving out pieces to better fit the windows and shōji.

Thursday, December 19, 2013

Chapter 73 - The Overhang to the Left Side Room, the Firepit (Irori)


December 14th - 19th 2013

As explained, I had skipped this chapter as I felt the firepit required my attention and little ingenuity to pull off.  But I finally got around to it.

First was to build the overhang.  Pretty straightforward and quick.  I had already done three of them so there was no big change in building this one.  The time consuming part is measuring out the spacing between the wooden slats.  Quick paint job, varnish and white tipping the under beam supports.  Then attached over the room doors.  Done.
Spacing the top part of the overhang.
The bottom part of the overhang.

Finished overhang.
Problem came up tho when I had to attach the two decorative beam fillers, one over the doors and one in the corner.  The one over the door didn’t fit for the same reason as the room’s internal ones - I had made a mistake in the overlap of the vertical slats.  Some sanding then a forced glue with clamps did the trick (I hope).  We’ll know better when the time comes to fit the ceiling to the landing area on.  I will re-enforce it then.  The corner piece also was a tight fit but that was a little easier as it required only some sanding.

Forcing the overhead beam filler.
On to the firepit - or the irori as it’s called.  (I also discovered the name of the hanging hook for the irori - a jizai-kagi)  The sunken firepit or hearth was a gathering place and source of heating not just for cooking but also for the room.  Usually the rooms were much larger but today there are even many restaurants that use the irori as a focal point for cooking.  There is more info on the kikkoman site which was helpful and informative.

My first task was to figure out a way to squish the battery carrier and the lights into the small hearth frame (appx 28mm square).  I fooled around with the foam core piece from the kit as the covering area and then had to cut the wires down to an acceptable length.  There was no soldering involved here but I did use my soldering iron to strip the wires. Super fast! I then glued the three fire bulbs onto the foam core support and left them overnite.  Next day, I trimmed down the wires some more and glued the actual battery holder into the foam core (and left that too for a while).  I then painted the bottom part of the irori and made some more notches to fit the battery in a little better.  Then sealed up the connections and glued the wires and switch in place. 

Firepit pieces and the FIRE LED kit from Evan Designs.
Gluing in the LEDs onto the foam core.
Gluing the switch and the wires into place.

Once the glue was set, I squished the battery into place and attached the back panel. I didn’t glue it in because I knew I may have to substitute the battery one day so all I will have to do is push from the top and the whole thing will pop out.






Adding some "ash" and charcoal pieces.

Celophane in place and adding more color to the coals.
Next step was coloring the switch, the top section and painting the inside of the pit a grey color.  I also covered the lights with a cellophane film included with the kit. It helps to tone down the flicker and make it a little less intense and more uniform.  Once that was glued down, I could add the sand (ashes) and charcoal bits, let those dry and then make some touch ups using some dark grey, grey and white. 















The last phase was the top section edge.  I glued that on and clamped it down.  And the trick was done.
Finished irori firepit.

Making the utensils for the fire pit.
















Only “problem” was that the irori wouldn’t actually accommodate the hanging pot I had already made.  The fire coals were higher up than if there were no battery underneath.  But I am more than happy making the sacrifice.  I added some small utensils for cleaning the pit too.  Once I complete a few more things, we can start adding some details to this room too.


Here is a video of the pit in action.  You can even hear Christmas music in the background! Yeah!

Friday, December 13, 2013

Chapter 74 - The Shōji to the Second Floor Landing, The Dressing Table

 December 12th - 13th 2013

I have been so busy lately between hosting my usual Thanksgiving here in Italy and then decorating my house for Christmas I didn’t really have time to do any dollhouse building.  The next chapter was supposed to be the fire pit but since it requires a little ingenuity (something I’ve been using too much of lately!) I figured I’d take a break and skip that chapter and take on this one which is relatively simple.

Basically I had already put together a dressing table in a previous chapter and I really wanted to get the back shōji window in so that I could at least place the second floor rooms on top of the house and away from my work table.  So.. that was the plan.

The rear shōji window was pretty easy.  It just needed painting and glueing around the frame then attaching the paper to the back.  The sliding supports were also easy to install.  I did not install the overhang since that would have to be put on once the side panels are applied to the back (and I still need to hide wiring under those wooden panels) so I just put it aside inn my container of pieces to be applied later.  So the sliding back window went together super quickly.
The supports in and back side of the shōji window.

The shōji from inside the 2nd floor landing (next to the bathroom)
The dressing table was also a little easier this time.  Since I knew pretty much where the problem areas were from the last one, I was able to anticipate problems in the fitting.  The cutting to size and double checking the fitting of the drawers was a must to save time.  Once the pieces were glued together, I just needed to paint and varnish them and leave to dry (at least this time a little less drying time as I bought some quicker drying varnish for small work - not flooring). 

Lots of tiny pieces to be cut and sanded.
Ready for assembly
Then I attached the mirror.  Now last time, I really didn’t look into the mirror covering thing deeply so this time I decided to check it out.  My first hunch was correct.  Most mirrors are covered if they are found in a bedroom.  I guess there are some superstitions about spirits coming out at nite or some kind of feng shui thing that says mirrors in bedrooms should be covered.  I found only one small picture of a covered mirror and it has kimono fabric instead of just regular cotton.  So, since I had a few kimono patterned pieces left over, I decided to use that to cover my mirror.
I think the kimono covering makes the difference.  Quite nice!
Finished dressing table with kimono covering.

Tuesday, November 26, 2013

Chapter 71 - The Hook for the Indoor Fire Pit, The Ceiling to the Left Hand Room


November 22nd - 26th 2013

This chapter is for the installation of the hanging ceiling hook to hold the kettle over the fire pit.  From my research, usually there is some kind of room for cooking over a coal or wood fire in an open pit.  As previously mentioned, it is not usually also a sleeping area although I have found some evidence that it could be.  I’m still undecided on what I’m going to do with mine.

In the meantime, the ceiling beam had to be prepared.  The kit furnished a beam that just needed some widdling but I decided to use a branch I had found when I started this kit (the other branch I found I used in the music room).  I cleaned it up (this one smelled but not as quite as badly as the other which was still fresh), sanded it, painted it and then went thru the usual stages of varnishing, sanding and varnishing.  While waiting for varnish to dry, I could put together the other objects needed for this room.
The original branch.

The branch now carved down and knotched.
























The hook is attached to a traditional piece of bamboo.  I preferred to keep everything black and painted the bamboo black instead of brown.  The fish required some shaping and sanding, then some carving.  It came out pretty good considering the size of the fish.  I did find a few tools that did the trick but I don’t own tiny sculpting tools so I just used the exacto knife.  When I finished with it, I painted it black as well (I guess the fish is actually supposed to be ghisa) then varnished that and the bamboo rod.
Shaping the fish.....

...then sculpting and carving it a bit.
 While those were drying, I went back to the branch and figured out a way to attach it as an overhead beam.  It was slightly shorter than the kit’s piece so I sawed off a tiny block from the kit’s beam and glued it to the left side of the wall.  That way, I could have the thin branch end resting on it.  I generously glued both sides and let them set overnite. I also decided to attach this room to the hall and finish the second floor unit.  I won’t attach it to the house just yet as I still have to install the final stair section in the hall.  But that comes later.
Glueing the beam into place.
Glue the room into place. Best way to keep constant contact and use a vice.
Once the fish and bamboo were dry, I worked on wrapping the hook from the kit around a smaller piece of wood and glued the string in place.  I then glued on the overhead rope and the metal mid support and hung the hook in the room.  I think the fish looks pretty convincing.  Perhaps I shouldn’t have varnished it so much, altho I can still dirty it as I suppose hanging over a charcoal fire it wouldn’t be so shiny.  I painted and attached the handle to the tiny pot.  I will probably fill the pot with some kind of contents at a later date.
Fish, hook and stabilizing rod in place.

Testing out the whole assembly.

























The final part of this chapter was building the ceiling to this room.  Since we still have some work to do in it, the ceiling is just positioned and will be glued down later.  While positioning it tho, I found that the beam on the right unattached - the ceiling is a tight fit.  So I had to cut another small block to support the right side of the beam too.  As long as it holds it up, I’m ok with it.
adding a little support.
This ceiling had the beams running front to back instead of side to side.  It’s nice that there is a little variety as each ceiling up to now has been exactly the same.  I won’t be drilling a hole in this ceiling as I don’t think a lamp or lantern would be hanging in this room if there is a fire pit in the center.  I’ll make a lamp instead to install from the back wall.
Penciling in guide lines to install the ceiling beams.

These running back to front.

Finished ceiling and fire pit assembly.
Next up - the fire pit.