Chapter 79 - Second Floor Landing Ceiling, Porch Sills, the Kutsunugi-ishi

July 2nd  - 4th 2014

Back to the build.
This chapter was completing the ceiling for the top floor landing and the sills that go along the outside of the porch.
The ceiling was usual straight forward painting, measuring the distances and gluing on the ceiling decorations.  I also made sure to drill a small hole where the bathroom light will go.  I have not glued the ceiling in place because first I have to mount the porches, then I have to attach the entire second floor to the first floor, and then I have to install the stairs.  So for now, the ceiling is just resting in place.
Gluing the ceiling pieces and painting the sill pieces.
Measuring out the placement of the ceiling decoration.
Ceiling decor finished.
Ceiling in place.
The next step was installing the sills.  The sills come in two parts. The base sill and the shingle like covering.  Installing the under still showed the badly fitted corner to the porch (from a previous chapter, I was unable to precisely match up the left side) so now, attaching the sills there was a bit of sanding to fit the bottoms on.  I fitted the tops by leaving a millimeter or two space where needed and fitting as best as possible.  After a light varnishing, I then glue the  bottom “supports” into place and the sills were done.
Gluing the upper sills in place.
Gluing the supports in place.
Finally, the last part was the kutsunugi-ishi or the stepping stone.  I used the same method as the pervious stones (four total) and painted the stone more greyish this time.  I added the sand and varnished the stone and with that, this chapter was complete. 
Sills and kutsunugi-ishi finished.

Sunday, September 15, 2013

Chapter 65 - The Second Floor Landing, The Kutsunugi-ishi

September 8th - 15th 2013

Well, after a long and much needed August holiday, I am back to work on the dollhouse.  I managed to spend some time with my parents in Maine as well as enjoying summertime on Little Sebago Lake with my family.  It was very nostalgic.

The next chapter was the construction of the second floor hallway landing.  I had already done this for the ground and first floor so it was pretty much a quick build.  The only thing was the time needed in between coats of paint, varnish and wax.  I also had to even out somewhat the right side since the piece of wood fairly thinner than the rest of the landing pieces.  I managed to slide in a few pieces of thin cardboard to even it out somewhat. 



Penciling in the floorboards.  Then cutting in the verticle lines.

Painting the floorboards. First coat of varnish on the larger piece.
After two coats of varnish and one of wax, polished and ready.

Evening out the right section with some extra paper for thickeness.

Clamped and drying time.

Adding the inside decorations to the stairwell.














 The kutsunugi-ishi or shoe stone was the same as the others more or less.  I wanted this one to have a little more brown and green highlights in it as well as appearing wet.  I don’t know why. I just liked the idea I guess.  Sort of like a moldy green damp stone. It actually does look that way.  But in reality it would just be polished.
First passage of colors, brown and dark grey.

Light addition of watered down green.

Completed with varnish and white sand.

Finished pavement and kutsunugi-ishi.

Wednesday, May 30, 2012

Chapter 49 - The Sills and Sliding Windows to the Left Porch Extension, the Kutsunugi-ishi

29 - 30th May 2012

I immediately put together and stained the sliding windows.  Since I had already done quite a few, they went together quickly.

The sills needed staining so while they dried, I put together the shoe cleaning stone or Kutsunugi-ishi.  I made this one with white stones instead of sand since I liked the look better.  Left it overnite for complete drying to be sure the stones would stay put.

I also managed to trim and rework the fern plant so that it would fit in the corner.  Now that it is there, I like it.  I had to unattached the ceiling and the bannister to fit it in (and reglue leaves that fell off again...) but overall it looks cute in the corner.  The finished landing looks pretty nice.

The reworked tree and the Kutsunugi-ishi on the right
The sills required some sanding and positioning but luckily, at least this set, went in no problem.  The top section of the sill was just penciled in lines to give the effect of an outdoor terrace floor.  The wooden beam-like detail underneath was a nice touch.  I am thinking of painting also these with white but will wait till I see the overall look.  I still have to install some kind of terrace railing out there.

The sliding door area needed aggressive sanding as I had predicted.  Since the bottom piece installed in the last chapter was a tight fit and didn’t slide all the way down.  So adjustment was made and the window sections finally slid into place. 

You can see the beam details under the terrace floor

With this chapter completed, I have actually finished one of two and half books that I made for the construction of the dollhouse.  As each edition of the kit arrived, I removed the instructions and made books of them.  That way, I was sure to know what came next.  It was a good thing too because I have noticed that some pages are mis-numbered.  I numbered the kit sets too to be sure I had them in order and could find the chapters while working.  I must say, my prep work saved me a lot of time and has pretty much sped up construction.

Thursday, March 15, 2012

Chapter 33 - First Floor Landing, Spa Window, Kutsunugi-ishi (Shoe removing Stone)

March 13 - 15th 2012

The Shoe Stone is quite strange.  It’s a little stone platform set into a small area that is then covered with sand.  I have never actually seen one so I have no idea what the true usage is.  It seems to be more used at the actual entrance of a house (not at an inside door entrance) and traditionally is surrounded by larger stones, not sand.  Technically, this is where you’d remove your shoes.  But I figured anyone entering the house would have already taken off their shoes downstairs in the vestibule. 

The Spa window was quick work except that it came out a bit darker than the surrounding woodwork.  I’ll have to sand it down a bit when I get around to making the shōji.  The inside sills were difficult to glue in because of the doors - even if my hands are quite small. 

Again here I had to make the “hardwood” flooring for the landing.  I do not enjoy this very much as I have to measure out each “board” 5mm from the last.  Still, the final effect is very convincing.  This flooring came out a little darker but I figure it’s ok considering that it would technically be less traveled.
You can see the small Kusunugi-ishi stone outside the door.

I also played around with one of the printables.  I found a bunch of little lanterns and printed and glued one.  Pretty cute actually.  I’m hoping I can put a small LED light inside these around the house.